Chain Link Fence Calculator

Chain link is sold differently: fabric comes in rolls, and each post gets a cap, bands and tension hardware. This calculator estimates posts, top rail, fabric sections and concrete.

Your Fence Project

System: Chain Link (fabric system)

Extra material for cut materials like rails, pickets and fabric. 10% is typical.
Default prices are public-market averages. Save your own prices and they will be reused across every FenceForge calculator.

Estimate

MaterialsQuantity
Terminal posts (end/corner/transition)
Why this quantity?2 node slots across 1 run(s)
2
Line posts
Why this quantity?Σ spans (25) + 1 per run − 0 shared − 2 terminal
24
Gate posts (hinge + latch)
Why this quantity?1 gate(s) × 2 posts
2
Chain-link fabric (50 ft rolls)
Why this quantity?Σ ceil(effective length ÷ 50 ft)
4
Top rail pipe (10'6" sticks)
Why this quantity?Σ ceil(effective length ÷ 10.5 ft)
19
Concrete bags (50 lb)
Why this quantity?ceil(hole volume − post displacement) ÷ yield × 28 posts (hole Ø10 in × 28 in deep)
112
Hardware kits / fasteners
Why this quantity?Sections + terminal/line post fittings + gate hardware
27
Gates1
Cost itemEstimate
Terminal posts (end/corner/transition)$52
Line posts$624
Gate posts (hinge + latch)$52
Chain-link fabric (50 ft rolls)$580
Top rail pipe (10'6" sticks)$266
Concrete bags (50 lb)$728
Hardware kits / fasteners$324
Gates (leaves)$160
Material cost$2,786
Labor (installed)$2,060

Estimated total: $4,846 (materials + labor)

Next step: Check post count & concrete bags →

Guide: How far apart should fence posts be? →

Estimates only — not a quote. Actual price depends on gates, corners, terrain, local labor rates and current material prices in your area. Default prices are public-market averages; switch on “My Pricing” to use your own numbers. Concrete and post-depth figures are planning estimates only — verify local code, frost depth, soil conditions and manufacturer requirements before you dig.

Chain link notes

Building a fence? Get our free Fence Planning Checklist — materials worksheet, permit pointers and a budget planner.